IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 32612 Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0210 # 02 Y:2022 02 2022 INSTALL SET-BACK TIMERS $14,339 $1,650 Implemented
DL0210 # 03 Y:2022 03 2022 INSTALL SET-BACK TIMERS $4,951 $2,500 Implemented
LE0517 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $125 $480 Implemented
LE0517 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $52,000 $100,000 Implemented
LE0517 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $603 $40 Implemented
LE0419 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,277 $63,000 Implemented
LE0419 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,202 $1,830 Implemented
LE0419 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,060 $25,900 Implemented
LE0419 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,334 $1,000 Implemented
LE0419 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,176 $61,332 Implemented
LE0419 # 07 Y:2016 07 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $41,911 $70,000 Implemented
DL0144 # 16 Y:2015 16 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $13,865 Implemented
DL0144 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $112,390 $100,000 Implemented
DL0144 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,820 $5,950 Implemented
DL0144 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,505 $14,190 Implemented
DL0144 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,011 $29,090 Implemented
DL0144 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN WATER LINES AND VALVES $120,650 $75,000 Implemented
LE0169 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,067 $0 Implemented
LE0169 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $862 $119 Implemented
LE0169 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $2,194 $1,250 Implemented
LE0169 # 01 Y:2003 01 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,674 $1,050 Implemented
LE0168 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,638 Implemented
LE0168 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,082 $100 Implemented
LE0166 # 05 Y:2003 05 2003 USE OPTIMUM THICKNESS INSULATION $13,043 $2,731 Implemented