IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

488

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0807 # 08 Y:2009 08 2009 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $22,644 $0 Not Implemented
UD0807 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,425 $8,602 Implemented
UD0807 # 10 Y:2009 10 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,853 $0 Not Implemented
UD0807 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,719 $23,924 Not Implemented
UD0807 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,249 $4,614 Implemented
UD0807 # 13 Y:2009 13 2009 MINIMIZE WATER USAGE $5,548 $5,000 Not Implemented
UD0807 # 14 Y:2009 14 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,896 $0 Not Implemented
UD0807 # 15 Y:2009 15 2009 INSULATE BARE EQUIPMENT $3,086 $2,700 Not Implemented
UD0807 # 16 Y:2009 16 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $2,000 Not Implemented
UD0807 # 17 Y:2009 17 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $2,533 Implemented
BD0362 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,931 $36,000 Implemented
BD0362 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $398 $325 Implemented
BD0362 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $701 $100 Implemented
BD0362 # 04 Y:2009 04 2009 USE SYNTHETIC LUBRICANT $1,202 $300 Implemented
BD0362 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,945 $2,900 Implemented
BD0362 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,913 $3,300 Implemented
BD0362 # 07 Y:2009 07 2009 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,156 $60,000 Not Implemented
BD0362 # 08 Y:2009 08 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $200 $0 Not Implemented
BD0362 # 09 Y:2009 09 2009 USE POWER DURING OFF-PEAK PERIODS $15,684 $2,000 Not Implemented
BD0362 # 10 Y:2009 10 2009 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,248 $520 Implemented
UD0798 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $177,970 $480,000 Not Implemented
UD0798 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $56,464 $62,640 Not Implemented
UD0798 # 03 Y:2009 03 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,050 $0 Not Implemented
UD0798 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,344 $62,000 Implemented
UD0798 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,669 $32,084 Not Implemented