IAC Assessment: BD0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2009
Principal Product Aerosol Dip Tubes
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3082 - Unsupported Plastics Profile Shapes
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 62,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,026 2,940,118 kWh $0.07
Electricity Demand $39,182 17,592 kW-months/year $2.23
Electricity Fees $14,316 - $ -
Natural Gas $14,681 1,345 MMBtu $10.92
TOTAL ENERGY COSTS $278,205
RECOMMENDED SAVINGS* $44,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,338
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,931
Cost:
$36,000
$11,559 172,071 $420 188 - - $952 - $11,559
172,071
kWh
$420
188
kW-months/year
-
-
MMBtu
$952
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$398
Cost:
$325
$247 3,662 $11 5 - - $140 - $247
3,662
kWh
$11
5
kW-months/year
-
-
MMBtu
$140
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$701
Cost:
$100
$659 9,776 $42 19 - - - - $659
9,776
kWh
$42
19
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,202
Cost:
$300
$1,130 16,758 $72 32 - - - - $1,130
16,758
kWh
$72
32
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,945
Cost:
$2,900
$1,828 27,121 $117 52 - - - - $1,828
27,121
kWh
$117
52
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,913
Cost:
$3,300
$1,809 26,835 $104 47 - - - - $1,809
26,835
kWh
$104
47
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$7,156
Cost:
$60,000
$6,766 100,386 $390 175 - - - - $6,766
100,386
kWh
$390
175
kW-months/year
-
-
MMBtu
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$200
Cost:
-
- - $200 90 - - - - -
-
kWh
$200
90
kW-months/year
-
-
MMBtu
-
-
$
09: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$15,684
Cost:
$2,000
$14,211 210,834 $1,473 661 - - - - $14,211
210,834
kWh
$1,473
661
kW-months/year
-
-
MMBtu
-
-
$
10: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$2,248
Cost:
$520
- - - - $2,248 206 - - -
-
kWh
-
-
kW-months/year
$2,248
206
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$44,378
Cost:
$105,445
$38,209 567,443 $2,829 1,269 $2,248 206 $1,092 - $38,209
567,443
kWh
$2,829
1,269
kW-months/year
$2,248
206
MMBtu
$1,092
-
$
TOTAL IMPLEMENTED Savings:
$21,338
Cost:
$43,445
$17,232 256,223 $766 343 $2,248 206 $1,092 - $17,232
256,223
kWh
$766
343
kW-months/year
$2,248
206
MMBtu
$1,092
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material