Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
471
matching recommendationsNAICS | 326121 | Unlaminated Plastics Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0177 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,349 | $3,260 | n/a |
IP0177 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,732 | $210 | n/a |
IP0177 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM TEMPERATURE | $10,080 | $0 | n/a |
IP0177 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,379 | $0 | n/a |
IP0177 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,187 | $0 | n/a |
IP0177 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,815 | $653 | n/a |
IP0177 # 06 Y:2023 | 06 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $91,806 | $8,000 | n/a |
IP0177 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $1,228 | $764 | n/a |
IP0177 # 09 Y:2023 | 09 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,101 | $1,200 | n/a |
IP0177 # 11 Y:2023 | 11 | 2023 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $409,614 | $304,570 | n/a |
OK1085 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,249 | $820,666 | Not Implemented |
OK1085 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,853 | $0 | Implemented |
OK1085 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,322 | $2,730 | Implemented |
OK1085 # 04 Y:2023 | 04 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $15,984 | $2,567 | Implemented |
OK1085 # 05 Y:2023 | 05 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $564 | $0 | Implemented |
DL0210 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,984 | $5,553 | Not Implemented |
DL0210 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $264,494 | $0 | Not Implemented |
DL0210 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $17,648 | $50,000 | Not Implemented |
DL0210 # 07 Y:2022 | 07 | 2022 | REDUCE EXCESSIVE BOILER BLOWDOWN | $17,995 | $0 | Not Implemented |
DL0210 # 03 Y:2022 | 03 | 2022 | INSTALL SET-BACK TIMERS | $4,951 | $2,500 | Implemented |
DL0210 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,792 | $0 | Not Implemented |
DL0210 # 02 Y:2022 | 02 | 2022 | INSTALL SET-BACK TIMERS | $14,339 | $1,650 | Implemented |
DL0210 # 09 Y:2022 | 09 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $86,400 | $1,000,000 | Not Implemented |
DL0210 # 08 Y:2022 | 08 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,443 | $20,000 | Not Implemented |
LE0517 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,255 | $400 | Not Implemented |