Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
488
matching recommendationsNAICS | 326121 | Unlaminated Plastics Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0177 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,732 | $210 | Not Implemented |
IP0177 # 01 Y:2023 | 01 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $431 | $0 | Not Implemented |
OK1085 # 05 Y:2023 | 05 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $564 | $0 | Implemented |
OK1085 # 04 Y:2023 | 04 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $15,984 | $2,567 | Implemented |
OK1085 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,322 | $2,730 | Implemented |
OK1085 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,249 | $820,666 | Not Implemented |
OK1085 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,853 | $0 | Implemented |
DL0210 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,792 | $0 | Not Implemented |
DL0210 # 02 Y:2022 | 02 | 2022 | INSTALL SET-BACK TIMERS | $14,339 | $1,650 | Implemented |
DL0210 # 03 Y:2022 | 03 | 2022 | INSTALL SET-BACK TIMERS | $4,951 | $2,500 | Implemented |
DL0210 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $264,494 | $0 | Not Implemented |
DL0210 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,984 | $5,553 | Not Implemented |
DL0210 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $17,648 | $50,000 | Not Implemented |
DL0210 # 07 Y:2022 | 07 | 2022 | REDUCE EXCESSIVE BOILER BLOWDOWN | $17,995 | $0 | Not Implemented |
DL0210 # 08 Y:2022 | 08 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,443 | $20,000 | Not Implemented |
DL0210 # 09 Y:2022 | 09 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $86,400 | $1,000,000 | Not Implemented |
LE0517 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $125 | $480 | Implemented |
LE0517 # 05 Y:2022 | 05 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,886 | $28,000 | Not Implemented |
LE0517 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,795 | $12,000 | Not Implemented |
LE0517 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $52,000 | $100,000 | Implemented |
LE0517 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,255 | $400 | Not Implemented |
LE0517 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $603 | $40 | Implemented |
AM0837 # 04 Y:2022 | 04 | 2022 | PAY UTILITY BILLS ON TIME | $197 | $0 | Implemented |
DL0198 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $2,034 | $5,600 | Not Implemented |
DL0198 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,240 | $2,500 | Implemented |