IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

488

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0177 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,732 $210 Not Implemented
IP0177 # 01 Y:2023 01 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $431 $0 Not Implemented
OK1085 # 05 Y:2023 05 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $564 $0 Implemented
OK1085 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $15,984 $2,567 Implemented
OK1085 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,322 $2,730 Implemented
OK1085 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $72,249 $820,666 Not Implemented
OK1085 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,853 $0 Implemented
DL0210 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $41,792 $0 Not Implemented
DL0210 # 02 Y:2022 02 2022 INSTALL SET-BACK TIMERS $14,339 $1,650 Implemented
DL0210 # 03 Y:2022 03 2022 INSTALL SET-BACK TIMERS $4,951 $2,500 Implemented
DL0210 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $264,494 $0 Not Implemented
DL0210 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $93,984 $5,553 Not Implemented
DL0210 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN WATER LINES AND VALVES $17,648 $50,000 Not Implemented
DL0210 # 07 Y:2022 07 2022 REDUCE EXCESSIVE BOILER BLOWDOWN $17,995 $0 Not Implemented
DL0210 # 08 Y:2022 08 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,443 $20,000 Not Implemented
DL0210 # 09 Y:2022 09 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $86,400 $1,000,000 Not Implemented
LE0517 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $125 $480 Implemented
LE0517 # 05 Y:2022 05 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,886 $28,000 Not Implemented
LE0517 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,795 $12,000 Not Implemented
LE0517 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $52,000 $100,000 Implemented
LE0517 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,255 $400 Not Implemented
LE0517 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $603 $40 Implemented
AM0837 # 04 Y:2022 04 2022 PAY UTILITY BILLS ON TIME $197 $0 Implemented
DL0198 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $2,034 $5,600 Not Implemented
DL0198 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,240 $2,500 Implemented