IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0792 # 01 Y:2009 01 2009 Wind Power $1,103,774 $5,850,000 Not Implemented
UD0792 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,846 $92,500 Not Implemented
UD0792 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $13,922 $4,000 Not Implemented
UD0792 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $12,029 $2,640 Not Implemented
UD0792 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $4,640 $12,000 Not Implemented
UD0792 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,270 $8,700 Not Implemented
UD0792 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,350 $1,000 Not Implemented
UD0792 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,247 $1,000 Not Implemented
UD0792 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,067 $5,170 Not Implemented
UD0792 # 11 Y:2009 11 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,050 $0 Not Implemented
UM0310 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $225 Implemented
UM0310 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $5,996 Implemented
UM0310 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,694 $2,000 Not Implemented
UM0310 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,978 $375 Implemented
UM0310 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,000 $14,850 Implemented
UM0310 # 01 Y:2006 01 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $31,460 $21,337 Not Implemented
UM0310 # 02 Y:2006 02 2006 INSTALL SOLID WASTE INCINERATOR FOR HEAT $30,322 $27,325 Not Implemented
WV0309 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,646 $232 Implemented
WV0309 # 14 Y:2005 14 2005 RECOVER AND REUSE COOLING WATER $12,688 $5,135 Not Implemented
WV0309 # 13 Y:2005 13 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $374 $0 Not Implemented
WV0309 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $512 $480 Not Implemented
WV0309 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $1,012 $133 Implemented
WV0309 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,066 $507 Implemented
WV0309 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,138 $0 Implemented
WV0309 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,334 $1,436 Not Implemented