IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0280 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,016 $3,196 Not Implemented
MZ0280 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $14,313 $9,858 Not Implemented
MZ0280 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,792 $2,148 Not Implemented
MZ0280 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,503 $24,934 Not Implemented
MZ0280 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,867 $24,520 Not Implemented
MZ0280 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $23,499 $2,058 Not Implemented
AM0781 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $780 Implemented
AM0781 # 04 Y:2019 04 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $762 Not Implemented
AM0781 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,710 $7,720 Implemented
AM0781 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $6,054 $17,860 Not Implemented
AM0781 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,349 $43 Not Implemented
UD0981 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,044 $0 Implemented
UD0981 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,704 $50 Not Implemented
UD0981 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,028 $500 Implemented
UD0981 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $12,524 $8,000 Not Implemented
UD0981 # 05 Y:2018 05 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,753 $700 Not Implemented
UD0981 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented
UD0981 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented
UD0981 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $6,131 $4,525 Implemented
UD0981 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,998 $4,275 Not Implemented
UD0981 # 10 Y:2018 10 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,398 $45,500 Not Implemented
OK0976 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,177 $240 Implemented
OK0976 # 08 Y:2017 08 2017 KEEP EQUIPMENT CLEAN $885 $240 Implemented
OK0976 # 06 Y:2017 06 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,094 $22,000 Not Implemented
OK0976 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,681 $35,200 Not Implemented