IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

471

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0492 # 11 Y:2016 11 2016 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $225 $200 n/a
LE0419 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,334 $1,000 Implemented
LE0419 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,060 $25,900 Implemented
LE0419 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,202 $1,830 Implemented
LE0419 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,277 $63,000 Implemented
LE0419 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,235 $60,700 Not Implemented
LE0419 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,176 $61,332 Implemented
LE0419 # 07 Y:2016 07 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $41,911 $70,000 Implemented
LE0419 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,339 $8,602 Not Implemented
OK0934 # 01 Y:2016 01 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $27,456 $25,000 Not Implemented
OK0934 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,615 $915 Not Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0934 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,990 $0 Not Implemented
OK0934 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,069 $10,000 Not Implemented
SU0389 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,788 $0 Not Implemented
SU0389 # 02 Y:2015 02 2015 DISCONNECT BALLASTS $1,418 $0 Not Implemented
SU0389 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $516 $0 Implemented
SU0389 # 04 Y:2015 04 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $10,554 $3,085 Implemented
SU0389 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $402 $158 Not Implemented
SU0389 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,731 $2,974 Implemented
SU0389 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,064 $2,148 Implemented
SU0389 # 08 Y:2015 08 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $119 $123 Implemented
SU0389 # 09 Y:2015 09 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $372 $804 Implemented
SU0389 # 10 Y:2015 10 2015 UPGRADE OBSOLETE EQUIPMENT $257 $1,070 Implemented