IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 326121 Unlaminated Plastics Profile Shape Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0981 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,704 $50 Not Implemented
UD0981 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,028 $500 Implemented
UD0981 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $12,524 $8,000 Not Implemented
UD0981 # 05 Y:2018 05 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,753 $700 Not Implemented
UD0981 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented
UD0981 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,343 $5,021 Not Implemented
UD0981 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $6,131 $4,525 Implemented
UD0981 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,998 $4,275 Not Implemented
UD0981 # 10 Y:2018 10 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,398 $45,500 Not Implemented
UD0981 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,044 $0 Implemented
UM0426 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,226 $1,000 Implemented
UM0426 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,407 $1,500 Implemented
UM0426 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,910 $3,500 Not Implemented
UM0426 # 02 Y:2013 02 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,400 $12,000 Not Implemented
UM0426 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,129 $17,000 Implemented
UM0390 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,753 $200 Not Implemented
UM0390 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $11,887 $2,716 Not Implemented
UM0390 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,502 $10,000 Not Implemented
UM0390 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $109,437 $163,095 Not Implemented
UM0390 # 05 Y:2011 05 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $27,012 $59,940 Not Implemented
UM0390 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,628 $5,000 Not Implemented
UM0265 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $975 Not Implemented
UM0265 # 07 Y:2004 07 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,652 $250 Not Implemented
UM0265 # 08 Y:2004 08 2004 COVER OPEN TANKS $855 $1,500 Not Implemented
UM0265 # 05 Y:2004 05 2004 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,581 $10,000 n/a