Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 326121 | Unlaminated Plastics Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0981 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,704 | $50 | Not Implemented |
UD0981 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,028 | $500 | Implemented |
UD0981 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $12,524 | $8,000 | Not Implemented |
UD0981 # 05 Y:2018 | 05 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,753 | $700 | Not Implemented |
UD0981 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,343 | $5,021 | Not Implemented |
UD0981 # 07 Y:2018 | 07 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,343 | $5,021 | Not Implemented |
UD0981 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $6,131 | $4,525 | Implemented |
UD0981 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,998 | $4,275 | Not Implemented |
UD0981 # 10 Y:2018 | 10 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $19,398 | $45,500 | Not Implemented |
UD0981 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,044 | $0 | Implemented |
UM0426 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,226 | $1,000 | Implemented |
UM0426 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,407 | $1,500 | Implemented |
UM0426 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,910 | $3,500 | Not Implemented |
UM0426 # 02 Y:2013 | 02 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,400 | $12,000 | Not Implemented |
UM0426 # 01 Y:2013 | 01 | 2013 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,129 | $17,000 | Implemented |
UM0390 # 01 Y:2011 | 01 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,753 | $200 | Not Implemented |
UM0390 # 02 Y:2011 | 02 | 2011 | INSULATE BARE EQUIPMENT | $11,887 | $2,716 | Not Implemented |
UM0390 # 03 Y:2011 | 03 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,502 | $10,000 | Not Implemented |
UM0390 # 04 Y:2011 | 04 | 2011 | REDUCE VENTILATION AIR | $109,437 | $163,095 | Not Implemented |
UM0390 # 05 Y:2011 | 05 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $27,012 | $59,940 | Not Implemented |
UM0390 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,628 | $5,000 | Not Implemented |
UM0265 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,069 | $975 | Not Implemented |
UM0265 # 07 Y:2004 | 07 | 2004 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,652 | $250 | Not Implemented |
UM0265 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $855 | $1,500 | Not Implemented |
UM0265 # 05 Y:2004 | 05 | 2004 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,581 | $10,000 | n/a |