Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 326121 | Unlaminated Plastics Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0492 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $10,912 | $4,050 | n/a |
BD0492 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,352 | $2,600 | n/a |
BD0492 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,305 | $500 | n/a |
BD0492 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,299 | $6,032 | n/a |
BD0492 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,039 | $20 | n/a |
BD0492 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $476 | $600 | n/a |
BD0492 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $529 | $75 | n/a |
BD0492 # 09 Y:2016 | 09 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $485 | $1,200 | n/a |
BD0492 # 10 Y:2016 | 10 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $285 | $200 | n/a |
BD0492 # 11 Y:2016 | 11 | 2016 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $225 | $200 | n/a |
BD0492 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,166 | $21,060 | n/a |
LE0419 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,060 | $25,900 | Implemented |
LE0419 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,339 | $8,602 | Not Implemented |
LE0419 # 07 Y:2016 | 07 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $41,911 | $70,000 | Implemented |
LE0419 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,176 | $61,332 | Implemented |
LE0419 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,235 | $60,700 | Not Implemented |
LE0419 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,277 | $63,000 | Implemented |
LE0419 # 03 Y:2016 | 03 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $2,202 | $1,830 | Implemented |
LE0419 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,334 | $1,000 | Implemented |
OK0934 # 01 Y:2016 | 01 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $27,456 | $25,000 | Not Implemented |
OK0934 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,615 | $915 | Not Implemented |
OK0934 # 03 Y:2016 | 03 | 2016 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $134,039 | $1,300 | Implemented |
OK0934 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $63,243 | $3,161 | Implemented |
OK0934 # 05 Y:2016 | 05 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,990 | $0 | Not Implemented |
OK0934 # 06 Y:2016 | 06 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,069 | $10,000 | Not Implemented |