IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0418 # 16 Y:2008 16 2008 CLEAN FOULING FROM WATER LINES REGULARLY $2,344 $7,838 Implemented
LL0304 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,266 $14,840 Implemented
LL0304 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $70 Implemented
OK0767 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,145 $1,383 Implemented
OK0767 # 05 Y:2008 05 2008 $2,068 $200 Implemented
OK0767 # 07 Y:2008 07 2008 INSTALL TIMERS AND/OR THERMOSTATS $46,431 $6,300 Implemented
OK0767 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,751 $0 Implemented
MZ0021 # 01 Y:2008 01 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $20,665 $20,000 Implemented
MZ0021 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,575 $900 Implemented
MZ0021 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,015 $5,000 Implemented
MZ0021 # 04 Y:2008 04 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $565 $40 Implemented
MZ0021 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,112 $21,425 Implemented
AM0536 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $26,800 $4,160 Implemented
AM0536 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,000 $230 Implemented
AM0536 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $822 Implemented
MS0321 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,742 $306 Implemented
SU0249 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,594 $0 Implemented
SU0249 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
SU0249 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $289 Implemented
SU0249 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,727 $589 Implemented
SU0249 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $334 Implemented
SU0249 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,719 $16,400 Implemented
SU0249 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,403 $19,107 Implemented
MI0121 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,669 $0 Implemented
MI0121 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,209 $420 Implemented