IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

409

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0321 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,742 $306 Implemented
MS0321 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,455 $2,724 Not Implemented
MS0321 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $854 $455 Not Implemented
SU0249 # 01 Y:2007 01 2007 USE SYNTHETIC LUBRICANT $2,139 $0 Not Implemented
SU0249 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,594 $0 Implemented
SU0249 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,329 $0 Implemented
SU0249 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,685 $289 Implemented
SU0249 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,727 $589 Implemented
SU0249 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $334 Implemented
SU0249 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,719 $16,400 Implemented
SU0249 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,403 $19,107 Implemented
SU0249 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $103 $457 Not Implemented
UF0377 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,493 $334 Not Implemented
UF0377 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $493 $415 Not Implemented
UF0377 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,064 $0 Not Implemented
UF0377 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $341 $0 Not Implemented
UF0377 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $542 $750 Not Implemented
UF0377 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,507 $13,121 Not Implemented
UF0377 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,877 $21,000 Not Implemented
UF0377 # 08 Y:2006 08 2006 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $626,232 $1,134,871 Not Implemented
UF0377 # 09 Y:2006 09 2006 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $4,718 $463 Not Implemented
UF0377 # 10 Y:2006 10 2006 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,000 $0 Not Implemented
MI0121 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,669 $0 Implemented
MI0121 # 02 Y:2006 02 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,836 $122 Not Implemented
MI0121 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,209 $420 Implemented