IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0377 # 08 Y:2006 08 2006 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $626,232 $1,134,871 Not Implemented
UF0377 # 09 Y:2006 09 2006 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $4,718 $463 Not Implemented
UF0377 # 10 Y:2006 10 2006 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,000 $0 Not Implemented
MI0121 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,669 $0 Implemented
MI0121 # 02 Y:2006 02 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,836 $122 Not Implemented
MI0121 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,209 $420 Implemented
MI0121 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,015 $964 Implemented
MI0121 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $996 $56 Not Implemented
MI0121 # 06 Y:2006 06 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $362 $0 Not Implemented
MS0270 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $207,595 $1,008,706 Implemented
MS0270 # 02 Y:2005 02 2005 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $62,790 $34,773 Not Implemented
MS0270 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,478 $89,204 Implemented
MS0270 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,299 $0 Implemented
MS0270 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,451 $228 Implemented
MS0270 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,035 $0 Not Implemented
MS0270 # 07 Y:2005 07 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $877 $0 Implemented
MS0270 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $635 $1,300 Not Implemented
LL0206 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $28,231 $3,647 Implemented
LL0206 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,510 $8,280 Implemented
LL0206 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,379 $30 Implemented
LL0206 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,403 $789 Not Implemented
LL0206 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $525 Implemented
LL0206 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $328 $401 Not Implemented
LL0206 # 07 Y:2004 07 2004 USE PHOTOCELL CONTROLS $323 $90 Implemented
LL0206 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $160 $150 Implemented