IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
NAICS 326122 Plastics Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0615 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $66,500 $73,000 n/a
UF0615 # 09 Y:2024 09 2024 UPGRADE CONTROLS ON COMPRESSORS $2,456 $4,000 n/a
UF0615 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,975 $10,830 n/a
UF0615 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,021 $5,898 n/a
UF0615 # 11 Y:2024 11 2024 IMPROVE SPACE COMFORT CONDITIONING $20,106 $3,020 n/a
UF0615 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $355 n/a
CI0020 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $76,570 $180,000 n/a
CI0020 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $92,262 $487,880 n/a
CI0020 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $55,349 $45,000 n/a
CI0020 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,503 $2,870 n/a
CI0020 # 05 Y:2023 05 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,187 $20,000 n/a
CI0020 # 06 Y:2023 06 2023 USE PHOTOCELL CONTROLS $1,246 $750 n/a
LE0553 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,093 $22,500 Not Implemented
LE0553 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,000 $91,800 Not Implemented
LE0553 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $561 $416 Not Implemented
LE0553 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $547 $270 Not Implemented
LE0553 # 04 Y:2023 04 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,974 $40,000 Not Implemented
CO0744 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,731 $3,276 n/a
CO0744 # 06 Y:2022 06 2022 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $60,192 $4,219 n/a
CO0744 # 05 Y:2022 05 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $210,000 $58,000 n/a
CO0744 # 04 Y:2022 04 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $1,847 $9,768 n/a
CO0744 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,175 $7,076 n/a
CO0744 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $881 $2,407 n/a
CO0744 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $26,159 $136,687 n/a
OK1065 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,263 $0 Implemented