IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 32615 Urethane and Other Foam Product (except Polystyrene) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0250 # 11 Y:2013 11 2013 INSTALL OCCUPANCY SENSORS $449 $330 Not Implemented
MZ0108 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,938 $0 Not Implemented
MZ0108 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $4,161 $4,018 Not Implemented
MZ0108 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,978 $1,256 Not Implemented
MZ0108 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,074 $10,000 Not Implemented
MZ0108 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,196 $3,512 Not Implemented
MZ0108 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,354 $1,090 Implemented
MZ0108 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $423 $360 Not Implemented
MZ0108 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $342 $200 Not Implemented
MZ0108 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $119 $32 Implemented
SD0467 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $24,055 $56,924 Implemented
SD0467 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,483 $12,710 Implemented
SD0467 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,612 $500 Implemented
SD0467 # 04 Y:2013 04 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,318 $6,100 Not Implemented
SD0467 # 05 Y:2013 05 2013 REPAIR AND ELIMINATE STEAM LEAKS $2,867 $200 Implemented
SD0467 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,309 $200 Implemented
SD0467 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,888 $400 Not Implemented
SD0467 # 08 Y:2013 08 2013 USE PHOTOCELL CONTROLS $1,846 $2,628 Implemented
SD0467 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,214 $2,058 Not Implemented
SF0425 # 01 Y:2013 01 2013 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,713 $0 Implemented
SF0425 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,421 $7,471 Implemented
SF0425 # 03 Y:2013 03 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,974 $5,906 Not Implemented
SF0425 # 04 Y:2013 04 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,255 $2,240 Not Implemented
SF0425 # 05 Y:2013 05 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $30,904 $9,885 Not Implemented
SF0425 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $7,235 Implemented