IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
NAICS 32616 Plastics Bottle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0332 # 10 Y:2006 10 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $411 $150 Not Implemented
WV0332 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $214 $123 Not Implemented
WI0501 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,224 $19,800 Not Implemented
WI0501 # 02 Y:2005 02 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,037 $30,800 Not Implemented
WI0501 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,905 $0 Not Implemented
WI0501 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,873 $0 Not Implemented
WI0501 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,008 $0 Not Implemented
WI0501 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $921 $800 Not Implemented
MI0109 # 01 Y:2005 01 2005 $30,000 $20,000 Not Implemented
MI0109 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,226 $1,350 Not Implemented
MI0109 # 03 Y:2005 03 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,803 $560 Not Implemented
MI0109 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,952 $400 Not Implemented
MI0109 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $4,352 $1,010 Not Implemented
MI0109 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,825 $346 Not Implemented
MI0109 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $828 $0 Not Implemented
MI0109 # 08 Y:2005 08 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $685 $156 Not Implemented
MI0109 # 09 Y:2005 09 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,606 $23,253 Not Implemented
AM0491 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $20,300 $56,420 Implemented
AM0491 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $8,990 $684 Implemented
AM0491 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $2,720 $0 Implemented
AM0491 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $380 $0 Implemented
OK0705 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,953 $32,150 Not Implemented
OK0705 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $978 $6,015 Not Implemented
OK0705 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,199 $1,007 Not Implemented
OK0705 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,908 $4,618 Not Implemented