Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
525
matching recommendationsNAICS | 32616 | Plastics Bottle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0327 # 07 Y:2025 | 07 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $17,852 | $35,000 | n/a |
TT0327 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $39,392 | $20,000 | n/a |
TT0327 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,500 | $550 | n/a |
TT0327 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,321 | $0 | n/a |
TT0327 # 02 Y:2025 | 02 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,048 | $0 | n/a |
TT0327 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $998 | $120 | n/a |
TT0327 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,101 | $31,875 | n/a |
AM0936 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $104,000 | $115,000 | n/a |
AM0936 # 04 Y:2025 | 04 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $35,490 | $397,200 | n/a |
AM0936 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $26,345 | $418,850 | n/a |
AM0936 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,840 | $1,490 | n/a |
AM0936 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,000 | $644,000 | n/a |
AM0936 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $30,000 | n/a |
SJ0030 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,245 | $0 | n/a |
SJ0030 # 08 Y:2025 | 08 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $663 | $4,755 | n/a |
SJ0030 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,287 | $0 | n/a |
SJ0030 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $630,866 | $6,247,450 | n/a |
SJ0030 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $136 | $1,200 | n/a |
SJ0030 # 06 Y:2025 | 06 | 2025 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $70,368 | $30,719 | n/a |
SJ0030 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,538 | $18,930 | n/a |
SJ0030 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,627 | $195,217 | n/a |
UL2415 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,820 | $0 | n/a |
UL2415 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $28,874 | $11,700 | n/a |
UL2415 # 03 Y:2024 | 03 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $62,771 | $58,367 | n/a |
UL2415 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,257 | $2,700 | n/a |