Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
479
matching recommendationsNAICS | 32616 | Plastics Bottle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0611 # 03 Y:2024 | 03 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $30,134 | $5,900 | n/a |
UF0611 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $99,213 | $111,120 | n/a |
UF0611 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $36,892 | $25,400 | n/a |
AM0877 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,900 | $60,360 | Implemented |
AM0877 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,290 | $74,067 | Implemented |
AM0877 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,440 | $105 | Implemented |
AM0877 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $35,600 | $148,000 | Implemented |
UF0592 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,412 | $25,400 | Not Implemented |
UF0592 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $56,023 | $88,370 | Implemented |
UF0592 # 11 Y:2023 | 11 | 2023 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $12,544 | $20,214 | Not Implemented |
UF0592 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,274 | $30,607 | Implemented |
UF0592 # 10 Y:2023 | 10 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $62,417 | $10,000 | Implemented |
AM0877 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,700 | $32,850 | Implemented |
AM0877 # 06 Y:2023 | 06 | 2023 | USE SYNTHETIC LUBRICANT | $7,230 | $675 | Not Implemented |
UF0592 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $9,922 | $11,796 | Implemented |
UF0592 # 04 Y:2023 | 04 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,287 | $18,600 | Implemented |
UF0592 # 07 Y:2023 | 07 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,981 | $508 | Implemented |
UF0592 # 01 Y:2023 | 01 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $73,113 | $215,600 | Not Implemented |
UF0592 # 08 Y:2023 | 08 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,672 | $1,200 | Implemented |
UF0592 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,580 | $600 | Implemented |
AM0877 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,060 | $0 | Implemented |
MS0409 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $96 | $582 | n/a |
MS0409 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $44,271 | $0 | n/a |
MS0409 # 03 Y:2022 | 03 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,770 | $0 | n/a |
DL0215 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,640 | $3,000 | Implemented |