Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 326160 | Plastics Bottle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0892 # 07 Y:2013 | 07 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,202 | $1,200 | Not Implemented |
UD0892 # 06 Y:2013 | 06 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,311 | $3,800 | Not Implemented |
UD0892 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $49,827 | $0 | Implemented |
UD0892 # 04 Y:2013 | 04 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $31,028 | $0 | Implemented |
UD0892 # 03 Y:2013 | 03 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $562 | $0 | Implemented |
UD0892 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $6,740 | $6,852 | Implemented |
UD0892 # 09 Y:2013 | 09 | 2013 | USE OPTIMUM THICKNESS INSULATION | $2,546 | $314 | Not Implemented |
UD0892 # 08 Y:2013 | 08 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $4,998 | $0 | Implemented |
UD0892 # 01 Y:2013 | 01 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $400 | $1,090 | Implemented |
UD0867 # 05 Y:2012 | 05 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,787 | $15,000 | Not Implemented |
UD0867 # 10 Y:2012 | 10 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,097 | $0 | Implemented |
UD0867 # 09 Y:2012 | 09 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $23,710 | $0 | Not Implemented |
UD0867 # 08 Y:2012 | 08 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,474 | $10,000 | Not Implemented |
UD0867 # 07 Y:2012 | 07 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,916 | $0 | Not Implemented |
UD0867 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,942 | $1,000 | Implemented |
UD0867 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,831 | $0 | Not Implemented |
UD0867 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,088 | $10,618 | Implemented |
UD0867 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,726 | $35,503 | Implemented |
UD0867 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,897 | $12,947 | Implemented |
UD0843 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,573 | $18,563 | Not Implemented |
UD0843 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,212 | $5,000 | Not Implemented |
UD0843 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,854 | $0 | Implemented |
UD0843 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,289 | $4,698 | Implemented |
UD0843 # 04 Y:2011 | 04 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,904 | $5,808 | Not Implemented |
UD0843 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $143 | $407 | Not Implemented |