IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0179 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,250 $13,450 Implemented
DL0179 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $26,500 $11,625 Implemented
DL0179 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,580 $15,000 Implemented
DL0179 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $5,600 $600 Implemented
DL0179 # 01 Y:2020 01 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,390 $2,500 Implemented
DL0100 # 07 Y:2013 07 2013 TREAT AND REUSE RINSE WATERS $7,121 $10,000 Implemented
DL0100 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $20,000 Implemented
DL0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $3,500 Implemented
DL0100 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,275 $0 Implemented
DL0100 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,567 $100 Implemented
DL0060 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,362 $21,600 Implemented
DL0060 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,957 $26,400 Implemented
DL0025 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,919 $30,000 Implemented
DL0025 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $36,900 $0 Implemented
DL0025 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,976 $0 Implemented
DL0007 # 07 Y:2007 07 2007 REPLACE BOILER $1,325 $10,425 Implemented
DL0007 # 05 Y:2007 05 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $181 $34 Implemented
DL0007 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,535 $140 Implemented
DL0007 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,672 $75 Implemented
DL0001 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,151 $13,790 Implemented
DL0001 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,111 $104,392 Implemented