IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

486

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0842 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,753 $2,522 Implemented
UD0842 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $750 $2,910 Not Implemented
UD0842 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,725 $3,654 Implemented
UD0842 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,349 $16,000 Not Implemented
UD0842 # 07 Y:2011 07 2011 UPGRADE CONTROLS ON COMPRESSORS $29,274 $20,000 Not Implemented
UD0842 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $789 $0 Not Implemented
UD0842 # 09 Y:2011 09 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,663 $15,000 Not Implemented
UD0842 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,657 $500 Implemented
UD0842 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $74,004 $162,000 Not Implemented
UD0842 # 12 Y:2011 12 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $76,354 $14,000 Not Implemented
UD0842 # 13 Y:2011 13 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,187 $0 Implemented
UD0842 # 14 Y:2011 14 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $39,018 $150,000 Implemented
UD0842 # 15 Y:2011 15 2011 USE RADIANT HEATER FOR SPOT HEATING $2,325 $3,523 Not Implemented
UD0842 # 16 Y:2011 16 2011 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $9,925 $10,558 Not Implemented
UD0816 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $2,978 $0 Not Implemented
UD0816 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,468 $0 Implemented
UD0816 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,881 $0 Implemented
UD0816 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,929 $0 Implemented
UD0816 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,108 $0 Implemented
UD0816 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $22,144 $0 Implemented
UD0816 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $346 $0 Not Implemented
UD0816 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $6,179 $0 Not Implemented
UD0816 # 09 Y:2010 09 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,412 $0 Implemented
UD0816 # 10 Y:2010 10 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,601 $0 Not Implemented
UD0816 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,426 $0 Implemented