IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,838

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0043 # 01 Y:2009 01 2009 Reduction $5,562 $2,500 Implemented
TT0043 # 02 Y:2009 02 2009 Hardware $11,711 $300 Implemented
TT0043 # 03 Y:2009 03 2009 Close Cycle Water Use $2,148 $2,568 Implemented
TT0043 # 04 Y:2009 04 2009 Miscellaneous $5,441 $0 Not Implemented
TT0043 # 05 Y:2009 05 2009 Hardware $3,007 $1,395 Implemented
UM0354 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,576 $69,141 Not Implemented
UM0354 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,778 $8,750 Implemented
UM0354 # 03 Y:2009 03 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,567 $9,570 Implemented
UM0354 # 04 Y:2009 04 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,144 $4,200 Implemented
UM0354 # 05 Y:2009 05 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $3,488 $0 Not Implemented
UM0354 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,114 $500 Implemented
UM0354 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $983 $200 Implemented
MI0177 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,329 $2,000 Implemented
MI0177 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $31,195 $912 Not Implemented
MI0177 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,542 $16,140 Not Implemented
MI0177 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,954 $1,210 Implemented
MI0177 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,166 $40 Implemented
MI0177 # 06 Y:2009 06 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,006 $4,531 Not Implemented
MI0177 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,697 $1,210 Implemented
MI0177 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,199 $40 Implemented
MI0177 # 09 Y:2009 09 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,417 $4,531 Not Implemented
MI0177 # 10 Y:2009 10 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $8,226 $3,320 Implemented
LE0287 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $184,606 $250,000 Not Implemented
LE0287 # 02 Y:2009 02 2009 INSTALL TIMERS AND/OR THERMOSTATS $220,823 $50,000 Not Implemented
LE0287 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79,515 $8,000 Not Implemented