Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,921
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0321 # 04 Y:2009 | 04 | 2009 | INSULATE BARE EQUIPMENT | $1,366 | $734 | Implemented |
LL0321 # 05 Y:2009 | 05 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $802 | $779 | Not Implemented |
LL0321 # 06 Y:2009 | 06 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $797 | $55 | Not Implemented |
IA0446 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,768 | $5,819 | Implemented |
IA0446 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,189 | $29,591 | Implemented |
IA0446 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,951 | $12,486 | Implemented |
IA0446 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,368 | $32,570 | Implemented |
IA0446 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $374 | $876 | Implemented |
IA0446 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,146 | $268 | Implemented |
IA0446 # 07 Y:2009 | 07 | 2009 | COVER OPEN TANKS | $26,317 | $20,000 | Not Implemented |
IA0446 # 08 Y:2009 | 08 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $23,136 | $15,000 | Not Implemented |
IA0446 # 09 Y:2009 | 09 | 2009 | INSULATE BARE EQUIPMENT | $4,474 | $3,180 | Not Implemented |
IA0446 # 10 Y:2009 | 10 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,136 | $740 | Implemented |
IA0446 # 11 Y:2009 | 11 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,917 | $1,860 | Not Implemented |
IA0446 # 12 Y:2009 | 12 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,241 | $15 | Not Implemented |
IA0446 # 13 Y:2009 | 13 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,403 | $1,860 | Not Implemented |
IA0446 # 14 Y:2009 | 14 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $505 | $1,000 | Not Implemented |
IA0446 # 15 Y:2009 | 15 | 2009 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $333 | $213 | Not Implemented |
IA0446 # 16 Y:2009 | 16 | 2009 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $16,258 | $40,000 | Implemented |
IA0446 # 17 Y:2009 | 17 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,399 | $1,461 | Not Implemented |
IA0446 # 18 Y:2009 | 18 | 2009 | TURN OFF STEAM TRACING DURING MILD WEATHER | $957 | $260 | Implemented |
IA0446 # 19 Y:2009 | 19 | 2009 | AIR CONDITION ONLY SPACE NECESSARY | $1,847 | $3,725 | Not Implemented |
IA0446 # 20 Y:2009 | 20 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $943 | $2,600 | Not Implemented |
IA0446 # 21 Y:2009 | 21 | 2009 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,298 | $115 | Implemented |
IA0446 # 22 Y:2009 | 22 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,469 | $15,000 | Implemented |