IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0349 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $8,788 $1,125 Implemented
BD0349 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,551 $96,150 Not Implemented
BD0349 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,618 $0 Not Implemented
BD0349 # 04 Y:2008 04 2008 REPLACE BOILER $205,005 $110,000 Not Implemented
BD0349 # 05 Y:2008 05 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $87,545 $10,000 Not Implemented
BD0349 # 06 Y:2008 06 2008 INSTALL TURBULATORS $131,143 $8,000 Not Implemented
BD0349 # 07 Y:2008 07 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $128,022 $46,000 Not Implemented
BD0349 # 08 Y:2008 08 2008 MINIMIZE WATER USAGE $991 $2,300 Not Implemented
OK0764 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,109 $5,086 Not Implemented
OK0764 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,596 $14,878 Not Implemented
OK0764 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $477 $1,165 Not Implemented
OK0764 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $22,038 $14,300 Not Implemented
OK0764 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $7,000 $0 Not Implemented
OK0764 # 06 Y:2008 06 2008 CLOSE OFF UNNEEDED STEAM LINES $7,161 $0 Not Implemented
OK0764 # 07 Y:2008 07 2008 REPAIR OR REPLACE STEAM TRAPS $28,620 $23,375 Not Implemented
OK0764 # 08 Y:2008 08 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $2,877 $0 Not Implemented
MI0165 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,777 $315,000 Not Implemented
MI0165 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,654 $41,800 Implemented
MI0165 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,875 $1,210 Implemented
MI0165 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,496 $40 Implemented
MI0165 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
UW0010 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,108 $4,160 Implemented
UW0010 # 02 Y:2008 02 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,398 $75,533 Not Implemented
UW0010 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,340 $3,000 Not Implemented
MI0159 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,617 $120 Implemented