Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,921
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0718 # 05 Y:2005 | 05 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $45,734 | $178,576 | Not Implemented |
UD0718 # 06 Y:2005 | 06 | 2005 | REDUCE VENTILATION AIR | $37,367 | $19,721 | Not Implemented |
UD0718 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,025 | $13,430 | Not Implemented |
UD0718 # 08 Y:2005 | 08 | 2005 | USE PHOTOCELL CONTROLS | $4,300 | $12,500 | Not Implemented |
UD0718 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,805 | $2,598 | Not Implemented |
UD0718 # 10 Y:2005 | 10 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $2,913 | $0 | Not Implemented |
UD0718 # 11 Y:2005 | 11 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,522 | $3,044 | Implemented |
UD0718 # 12 Y:2005 | 12 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $762 | $362 | Not Implemented |
LM0097 # 01 Y:2005 | 01 | 2005 | DEVELOP STANDARD OPERATING PROCEDURES | $48,120 | $4,921 | Implemented |
LM0097 # 02 Y:2005 | 02 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,000 | $6,000 | Not Implemented |
LM0097 # 03 Y:2005 | 03 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $166,760 | $6,090 | Not Implemented |
LM0097 # 04 Y:2005 | 04 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $53,375 | $1,500 | Implemented |
LM0097 # 05 Y:2005 | 05 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $1,250 | $0 | Implemented |
LM0097 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $284 | $50 | Implemented |
LM0097 # 07 Y:2005 | 07 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $933 | $35,082 | Implemented |
IC0099 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,719 | $35,000 | Not Implemented |
IC0099 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,085 | $66,591 | Not Implemented |
IC0099 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $246 | $0 | Implemented |
IC0099 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,577 | $1,200 | Implemented |
IC0099 # 05 Y:2005 | 05 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $6,852 | $1,520 | Implemented |
IC0099 # 06 Y:2005 | 06 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $671 | $48 | Not Implemented |
IC0099 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $92 | $364 | Not Implemented |
IC0099 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $531 | $1,121 | Not Implemented |
UF0360 # 01 Y:2005 | 01 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,102 | $34,362 | Implemented |
UF0360 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,418 | $744 | Implemented |