Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,921
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0081 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,775 | $0 | Implemented |
TA0081 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,360 | $0 | Implemented |
TA0081 # 04 Y:2004 | 04 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $11,120 | $2,795 | Not Implemented |
TA0081 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $40 | Implemented |
TA0081 # 06 Y:2004 | 06 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,255 | $190 | Not Implemented |
TA0081 # 07 Y:2004 | 07 | 2004 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,035 | $0 | Implemented |
TA0081 # 08 Y:2004 | 08 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,880 | $0 | Not Implemented |
UM0264 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,250 | $2,600 | Implemented |
UM0264 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,340 | $12,530 | n/a |
UM0264 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $7,700 | $800 | Not Implemented |
UM0264 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,653 | $9,433 | Not Implemented |
UM0264 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $2,270 | $5,610 | Not Implemented |
UM0264 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $1,281 | $509 | Not Implemented |
UM0264 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,670 | $500 | Not Implemented |
UM0264 # 08 Y:2004 | 08 | 2004 | COVER OPEN TANKS | $379 | $500 | Not Implemented |
UM0264 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $312 | $200 | Not Implemented |
WV0292 # 01 Y:2004 | 01 | 2004 | INSULATE BARE EQUIPMENT | $27,182 | $23,577 | Implemented |
WV0292 # 02 Y:2004 | 02 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $20,348 | $0 | Implemented |
WV0292 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $19,410 | $20,490 | Not Implemented |
WV0292 # 04 Y:2004 | 04 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $20,214 | $5,139 | Not Implemented |
WV0292 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $12,831 | $800 | Implemented |
WV0292 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,831 | $488 | Not Implemented |
WV0292 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,318 | $16,842 | Not Implemented |
WV0292 # 08 Y:2004 | 08 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,268 | $3,720 | Not Implemented |
WV0292 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,017 | $21,962 | Not Implemented |