IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0081 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $14,775 $0 Implemented
TA0081 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $11,360 $0 Implemented
TA0081 # 04 Y:2004 04 2004 REPROCESS SPENT OILS ON SITE FOR RE-USE $11,120 $2,795 Not Implemented
TA0081 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $40 Implemented
TA0081 # 06 Y:2004 06 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,255 $190 Not Implemented
TA0081 # 07 Y:2004 07 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,035 $0 Implemented
TA0081 # 08 Y:2004 08 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,880 $0 Not Implemented
UM0264 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,250 $2,600 Implemented
UM0264 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,340 $12,530 n/a
UM0264 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $7,700 $800 Not Implemented
UM0264 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,653 $9,433 Not Implemented
UM0264 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $2,270 $5,610 Not Implemented
UM0264 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,281 $509 Not Implemented
UM0264 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,670 $500 Not Implemented
UM0264 # 08 Y:2004 08 2004 COVER OPEN TANKS $379 $500 Not Implemented
UM0264 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $312 $200 Not Implemented
WV0292 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $27,182 $23,577 Implemented
WV0292 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $20,348 $0 Implemented
WV0292 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $19,410 $20,490 Not Implemented
WV0292 # 04 Y:2004 04 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $20,214 $5,139 Not Implemented
WV0292 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $12,831 $800 Implemented
WV0292 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $11,831 $488 Not Implemented
WV0292 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,318 $16,842 Not Implemented
WV0292 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,268 $3,720 Not Implemented
WV0292 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,017 $21,962 Not Implemented