IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0300 # 15 Y:2004 15 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $186 Implemented
WV0300 # 16 Y:2004 16 2004 ISOLATE HOT OR COLD EQUIPMENT $258 $544 Not Implemented
WV0300 # 17 Y:2004 17 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $172,800 $360 Implemented
OR0460 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $1,500 Implemented
OR0460 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,070 $1,830 Implemented
OR0460 # 03 Y:2004 03 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $16,000 $0 Implemented
OR0460 # 04 Y:2004 04 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $37,500 $14,200 Not Implemented
OR0460 # 05 Y:2004 05 2004 MOVE PRODUCT USING MECHANICAL MEANS $7,850 $2,320 Implemented
LM0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,448 $410 Not Implemented
LM0079 # 02 Y:2004 02 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $846 $30 Not Implemented
LM0079 # 03 Y:2004 03 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,758 $8,250 Not Implemented
LM0079 # 04 Y:2004 04 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,000 $3,122 Not Implemented
LM0079 # 05 Y:2004 05 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,045 $0 Not Implemented
OR0458 # 01 Y:2004 01 2004 MODIFY WORKLOAD $60,800 $480 Not Implemented
OR0458 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $9,440 $7,400 Not Implemented
OR0458 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,200 $4,600 Not Implemented
OR0458 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,000 Not Implemented
OR0458 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,800 $0 Not Implemented
OR0458 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,880 $3,000 Not Implemented
AS0382 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,391 $50 Implemented
AS0382 # 02 Y:2004 02 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,403 $240 Implemented
AS0382 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $6,446 Implemented
AS0382 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $736 $128,880 Implemented
AS0382 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,254 $4,200 Implemented
AS0382 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $1,697 Implemented