Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
3,980
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0276 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $14,713 | $3,487 | Not Implemented |
NC0276 # 05 Y:2004 | 05 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,432 | $1,085 | Implemented |
NC0276 # 06 Y:2004 | 06 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,405 | $5,000 | Not Implemented |
NC0276 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,023 | $1,170 | Implemented |
UD0684 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $34,560 | $0 | Implemented |
UD0684 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,504 | $37,800 | Not Implemented |
UD0684 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,995 | $29,250 | Not Implemented |
UD0684 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,725 | $6,450 | Not Implemented |
UD0684 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,700 | $770 | Not Implemented |
UD0684 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,792 | $100 | Not Implemented |
UD0684 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,780 | $0 | Not Implemented |
UD0684 # 08 Y:2003 | 08 | 2003 | INSTALL COMMON HEADER ON COMPRESSORS | $3,865 | $0 | Not Implemented |
UD0684 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,252 | $8,000 | Not Implemented |
UD0684 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,396 | $613 | Not Implemented |
UD0684 # 11 Y:2003 | 11 | 2003 | METER WASTE WATER | $1,513 | $2,000 | Not Implemented |
UD0684 # 12 Y:2003 | 12 | 2003 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $3,323 | $3,503 | Not Implemented |
UD0684 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,290 | $660 | Not Implemented |
UD0684 # 14 Y:2003 | 14 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,207 | $4,000 | Not Implemented |
UD0684 # 15 Y:2003 | 15 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $1,400 | Not Implemented |
UD0684 # 16 Y:2003 | 16 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $965 | $0 | Not Implemented |
UD0684 # 17 Y:2003 | 17 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580 | $110 | Not Implemented |
WI0454 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,309 | $61,875 | Implemented |
WI0454 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,002 | $24,500 | Not Implemented |
WI0454 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $4,154 | $10,500 | Not Implemented |
WI0454 # 04 Y:2003 | 04 | 2003 | INSTALL SET-BACK TIMERS | $4,115 | $400 | Implemented |