IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

477

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0292 # 10 Y:2004 10 2004 REPAIR OR REPLACE STEAM TRAPS $40,944 $1,000 Implemented
WV0292 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,074 $0 Implemented
WV0292 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,851 $528 Implemented
WV0292 # 13 Y:2004 13 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,626 $750 Implemented
WV0292 # 14 Y:2004 14 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,330 $420 Implemented
WV0292 # 15 Y:2004 15 2004 INSTALL OCCUPANCY SENSORS $1,326 $1,048 Implemented
WV0292 # 16 Y:2004 16 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,014 $100 Implemented
WV0292 # 17 Y:2004 17 2004 KEEP LAMPS AND REFLECTORS CLEAN $841 $840 Implemented
WV0292 # 18 Y:2004 18 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $665 $1,296 Not Implemented
WV0292 # 19 Y:2004 19 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $625 $30 Implemented
WV0292 # 20 Y:2004 20 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,866 $8,560 Not Implemented
WV0292 # 21 Y:2004 21 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $13,489 $4,460 Not Implemented
WV0292 # 22 Y:2004 22 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,249 $1,200 Implemented
WV0292 # 23 Y:2004 23 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,043 $459 Not Implemented
WV0292 # 24 Y:2004 24 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,935 $5,740 Not Implemented
WV0292 # 25 Y:2004 25 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,929 $3,460 Not Implemented
WV0292 # 26 Y:2004 26 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,494 $4,715 Implemented
WV0292 # 27 Y:2004 27 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,007 $1,000 Implemented
WV0292 # 28 Y:2004 28 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,659 $2,088 Not Implemented
WV0292 # 29 Y:2004 29 2004 INSTALL OCCUPANCY SENSORS $1,497 $1,944 Not Implemented
UD0683 # 01 Y:2003 01 2003 $30,335 $50,000 Not Implemented
UD0683 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $11,700 Implemented
UD0683 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,600 $4,625 Not Implemented
UD0683 # 04 Y:2003 04 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,225 $0 Not Implemented
UD0683 # 05 Y:2003 05 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $0 Not Implemented