Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
386
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0547 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,625 | $240 | Implemented |
SF0547 # 04 Y:2019 | 04 | 2019 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $8,499 | $960 | Not Implemented |
SF0547 # 05 Y:2019 | 05 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $40,841 | $4,800 | Not Implemented |
SF0547 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,069 | $7,542 | Not Implemented |
SF0547 # 08 Y:2019 | 08 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $17,743 | $33,601 | Implemented |
SF0547 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $3,114 | $6,574 | Implemented |
SF0547 # 10 Y:2019 | 10 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $120,071 | $1,107,885 | Not Implemented |
SF0547 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,127 | $1,647 | Implemented |
SD0586 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,943 | $750 | Not Implemented |
SD0586 # 07 Y:2019 | 07 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $1,750 | $350 | Implemented |
SD0586 # 06 Y:2019 | 06 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,834 | $2,795 | Implemented |
SD0586 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $1,882 | $330 | Implemented |
SD0586 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,460 | $0 | Implemented |
SD0586 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,548 | $17,875 | Implemented |
SD0586 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,164 | $24,783 | Implemented |
SD0586 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $57,437 | $117,800 | Implemented |
SD0584 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $352 | $0 | Not Implemented |
SD0584 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $667 | $0 | Implemented |
SD0584 # 04 Y:2019 | 04 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $810 | $1,204 | Not Implemented |
SD0584 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,463 | $13,165 | Implemented |
SD0584 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,045 | $300 | Implemented |
SD0584 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,249 | $11,435 | Not Implemented |
SD0577 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $645 | $400 | Implemented |
SD0577 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,306 | $875 | Not Implemented |
SD0577 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,125 | $0 | Not Implemented |