IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0367 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $100 Implemented
SU0367 # 04 Y:2014 04 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,111 $527 Not Implemented
SU0367 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $320 $100 Implemented
SU0367 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $913 $646 Not Implemented
SU0367 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $582 Implemented
SU0367 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $3,256 Not Implemented
SU0367 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,775 $6,702 Not Implemented
SU0367 # 10 Y:2014 10 2014 UPGRADE OBSOLETE EQUIPMENT $263 $1,078 Implemented
SU0343 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,599 $3,200 Implemented
SU0343 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,686 $1,270 Not Implemented
SU0343 # 03 Y:2013 03 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $461 $83 Not Implemented
SU0343 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,051 $326 Not Implemented
SU0343 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,297 $21,467 Not Implemented
SU0340 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,153 $0 Implemented
SU0340 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $1,696 $1,150 Implemented
SU0340 # 03 Y:2013 03 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $60 $202 Not Implemented
SU0340 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,813 $15,885 Implemented
SU0277 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,251 $0 Implemented
SU0277 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $199 Implemented
SU0277 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $789 $575 Implemented
SU0277 # 04 Y:2009 04 2009 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,047 $1,780 Not Implemented
SU0277 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,801 $3,568 Not Implemented
SU0277 # 06 Y:2009 06 2009 REDUCE VENTILATION AIR $6,910 $13,891 Not Implemented
SU0277 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $91 $288 Not Implemented
SU0277 # 08 Y:2009 08 2009 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,228 $160,000 Implemented