IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0090 # 02 Y:2017 02 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $3,956 $110 Implemented
IP0090 # 03 Y:2017 03 2017 COVER OPEN TANKS $12,129 $1,104 Implemented
IP0090 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,344 $1,170 Implemented
IP0090 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,525 $2,345 Implemented
IP0090 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,535 $1,350 Implemented
IP0090 # 07 Y:2017 07 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $3,206,016 $2,150,000 Not Implemented
IP0090 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $2,178 $2,494 Implemented
IP0090 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,026 $8,813 Implemented
IP0090 # 10 Y:2017 10 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,683 $7,908 Not Implemented
IP0090 # 11 Y:2017 11 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $113 $220 Implemented
IP0090 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $465 Implemented
IP0090 # 13 Y:2017 13 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $73,410 $256,380 Implemented
NL0012 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,477 $136 Implemented
NL0012 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Not Implemented
NL0012 # 03 Y:2017 03 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,183 $250 Implemented
NL0012 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,638 $9,825 Implemented
NL0012 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $920 $980 Not Implemented
NL0012 # 06 Y:2017 06 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $582 $2,100 Not Implemented
NL0012 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $163 $157 Implemented
BS0103 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $181 $74 Not Implemented
BS0103 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $172 $60 Not Implemented
BS0103 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $4,908 $2,820 Not Implemented
BS0103 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $1,019 $585 Not Implemented
BS0103 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $133 $78 Not Implemented
BS0103 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,369 $1,489 Not Implemented