IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0521 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $8,590 $4,950 Not Implemented
SD0521 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,749 $1,000 Not Implemented
SD0521 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,938 $800 Not Implemented
SD0521 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,421 $3,450 Not Implemented
SD0521 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,279 $1,300 Not Implemented
SD0521 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $1,418 $3,648 Not Implemented
SD0521 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $566 $203 Not Implemented
OK0930 # 01 Y:2015 01 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137,102 $90,000 Not Implemented
OK0930 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,351 $10,800 Not Implemented
OK0930 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,131 $0 Implemented
IP0055 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,465 $3 Not Implemented
IP0055 # 02 Y:2015 02 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,351 $0 Implemented
IP0055 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,460 $3 Implemented
IP0055 # 04 Y:2015 04 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,413 $3 Not Implemented
IP0055 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,177 $86 Implemented
IP0055 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,880 Not Implemented
IP0055 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $568 $1,146 Not Implemented
SU0401 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $2,820 $0 Implemented
SU0401 # 02 Y:2015 02 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,274 $1,580 Implemented
SU0401 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $964 $469 Not Implemented
SU0401 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $383 $240 Implemented
SU0401 # 05 Y:2015 05 2015 REPLACE BOILER $11,805 $10,686 Implemented
SU0401 # 06 Y:2015 06 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $218 $404 Not Implemented
SU0401 # 07 Y:2015 07 2015 ELIMINATE/REDUCE AN OPERATION $956 $3,709 Not Implemented
SU0401 # 08 Y:2015 08 2015 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,780 $49,000 Not Implemented