Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,921
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0553 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,396 | $200 | Implemented |
NC0553 # 09 Y:2015 | 09 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $971 | $2,000 | Not Implemented |
NC0553 # 10 Y:2015 | 10 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $314 | $100 | Not Implemented |
NC0553 # 11 Y:2015 | 11 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,035 | $200 | Implemented |
NC0553 # 12 Y:2015 | 12 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,175 | $4,256 | Not Implemented |
BD0466 # 01 Y:2015 | 01 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,003 | $15,800 | Implemented |
BD0466 # 02 Y:2015 | 02 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $11,592 | $36,000 | Not Implemented |
BD0466 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,541 | $8,170 | Implemented |
BD0466 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,192 | $15,910 | Not Implemented |
BD0466 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,362 | $20 | Not Implemented |
BD0466 # 06 Y:2015 | 06 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $2,803 | $2,200 | Not Implemented |
BD0466 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,559 | $8,515 | Implemented |
BD0466 # 08 Y:2015 | 08 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $921 | $648 | Implemented |
BD0466 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $899 | $1,275 | Implemented |
BD0466 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $1,000 | Not Implemented |
BD0466 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $25 | Implemented |
AM0688 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,420 | $36,000 | Not Implemented |
AM0688 # 02 Y:2015 | 02 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $33,890 | $0 | Implemented |
AM0688 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,270 | $26,600 | Implemented |
AM0688 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,290 | $12,000 | Implemented |
AM0688 # 05 Y:2015 | 05 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $8,220 | $1,880 | Implemented |
AM0688 # 06 Y:2015 | 06 | 2015 | KEEP LAMPS AND REFLECTORS CLEAN | $8,140 | $4,320 | Not Implemented |
AM0688 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,060 | $120 | Not Implemented |
AM0688 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $4,230 | $5,100 | Implemented |
AM0688 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,710 | $40 | Implemented |