IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0488 # 10 Y:2012 10 2012 AIR CONDITION ONLY SPACE NECESSARY $1,073 $70 Not Implemented
IA0488 # 11 Y:2012 11 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,909 $743 Not Implemented
OR0593 # 01 Y:2012 01 2012 USE MORE EFFICIENT ADHESIVE APPLICATORS $72,379 $43,800 Not Implemented
OR0593 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $4,751 Implemented
OR0593 # 03 Y:2012 03 2012 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,514 $900 Not Implemented
OR0593 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $930 $2,250 Not Implemented
OR0593 # 05 Y:2012 05 2012 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,590 $34,684 Not Implemented
BS0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $272 Implemented
BS0004 # 02 Y:2012 02 2012 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,756 $802 Implemented
BS0004 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,382 $5,000 Not Implemented
BS0004 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,570 $3,866 Not Implemented
BS0004 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $653 $885 Not Implemented
BS0004 # 06 Y:2012 06 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,840 $34 Implemented
BS0004 # 07 Y:2012 07 2012 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,240 $119 Not Implemented
OR0585 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,690 $2,000 Not Implemented
OR0585 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $1,776 $500 Not Implemented
OR0585 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $2,305 Implemented
OR0585 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,171 $1,000 Not Implemented
OR0585 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,942 $1,000 Not Implemented
OR0585 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $13,449 $24,282 Not Implemented
OR0585 # 08 Y:2012 08 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,379 $16,379 Not Implemented
OR0585 # 09 Y:2012 09 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $7,083 $47,838 Not Implemented
OR0585 # 10 Y:2012 10 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,580 $0 Not Implemented
OR0585 # 11 Y:2012 11 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,086 $16,390 Implemented
OR0585 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,836 $7,417 Not Implemented