Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
301
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0684 # 14 Y:2003 | 14 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,207 | $4,000 | Not Implemented |
UD0684 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,396 | $613 | Not Implemented |
UD0684 # 12 Y:2003 | 12 | 2003 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $3,323 | $3,503 | Not Implemented |
UD0684 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,780 | $0 | Not Implemented |
UD0684 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $3,252 | $8,000 | Not Implemented |
UD0684 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,725 | $6,450 | Not Implemented |
UD0684 # 06 Y:2003 | 06 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,792 | $100 | Not Implemented |
UD0684 # 17 Y:2003 | 17 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $580 | $110 | Not Implemented |
UD0684 # 15 Y:2003 | 15 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $1,400 | Not Implemented |
UD0684 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,700 | $770 | Not Implemented |
UD0684 # 16 Y:2003 | 16 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $965 | $0 | Not Implemented |
UD0684 # 11 Y:2003 | 11 | 2003 | METER WASTE WATER | $1,513 | $2,000 | Not Implemented |
UD0684 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,995 | $29,250 | Not Implemented |
UD0684 # 13 Y:2003 | 13 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,290 | $660 | Not Implemented |
UD0684 # 08 Y:2003 | 08 | 2003 | INSTALL COMMON HEADER ON COMPRESSORS | $3,865 | $0 | Not Implemented |
UD0684 # 01 Y:2003 | 01 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $34,560 | $0 | Implemented |
UD0684 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,504 | $37,800 | Not Implemented |
WI0454 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $4,154 | $10,500 | Not Implemented |
WI0454 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,192 | $1,600 | Implemented |
WI0454 # 04 Y:2003 | 04 | 2003 | INSTALL SET-BACK TIMERS | $4,115 | $400 | Implemented |
WI0454 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,128 | $1,980 | Implemented |
WI0454 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,309 | $61,875 | Implemented |
WI0454 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,002 | $24,500 | Not Implemented |
UD0683 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $2,600 | $4,625 | Not Implemented |
UD0683 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,720 | $11,700 | Implemented |