Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsNAICS | 32619 | Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0258 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $2,112 | $5,500 | n/a |
DL0258 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,808 | $25,000 | n/a |
DL0258 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,102 | $3,500 | n/a |
DL0258 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,565 | $200 | n/a |
UL2504 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $168 | n/a |
UL2504 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $601 | $2,445 | n/a |
UL2504 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,017 | $630 | n/a |
UL2504 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $10,447 | $57,490 | n/a |
UL2504 # 06 Y:2025 | 06 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $17,226 | $135,000 | n/a |
UL2504 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $45,536 | $20,280 | n/a |
UL2504 # 07 Y:2025 | 07 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,512 | $0 | n/a |
UL2504 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,944 | $219,965 | n/a |
MZ0373 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,800 | $5,600 | n/a |
MZ0373 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,877 | $6,000 | n/a |
MZ0373 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,710 | $120 | n/a |
MZ0373 # 03 Y:2025 | 03 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,122 | $500 | n/a |
MZ0373 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,188 | $16,280 | n/a |
MZ0373 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,241 | $120,000 | n/a |
MZ0373 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $0 | n/a |
MZ0373 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $882 | $1,200 | n/a |
MZ0373 # 07 Y:2025 | 07 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,825 | $0 | n/a |
MZ0373 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $948 | n/a |
SU0568 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,415 | $0 | n/a |
SU0568 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $702 | $1,754 | n/a |
SU0568 # 10 Y:2025 | 10 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $67 | $383 | n/a |