Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,653
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0196 # 01 Y:2024 | 01 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $507 | $0 | Implemented |
IP0196 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,499 | $2,975 | Implemented |
IP0196 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,327 | $2,497 | Implemented |
IP0196 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,126 | $42 | Implemented |
IP0196 # 02 Y:2024 | 02 | 2024 | MODIFY STARTUP/SHUTDOWN TIMES | $1,880 | $40 | Implemented |
UF0614 # 14 Y:2024 | 14 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $5,321 | $3,260 | Implemented |
UF0614 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,952 | $39,000 | Implemented |
UF0614 # 10 Y:2024 | 10 | 2024 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,337 | $1,797 | Implemented |
UF0614 # 12 Y:2024 | 12 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,444 | $4,280 | Implemented |
UF0614 # 13 Y:2024 | 13 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $27,969 | $60,000 | Implemented |
UF0614 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,910 | $351 | Implemented |
UF0614 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $35,722 | $41,798 | Implemented |
UF0614 # 03 Y:2024 | 03 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $24,631 | $18,563 | Implemented |
UF0614 # 07 Y:2024 | 07 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,473 | $24,140 | Implemented |
TT0312 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,294 | $1,860 | Implemented |
TT0312 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,815 | $6,360 | Implemented |
TT0312 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,292 | $635 | Implemented |
TT0312 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $36,945 | $0 | Implemented |
NT0021 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,801 | $7,120 | Implemented |
NT0021 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,130 | $0 | Implemented |
NT0021 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,153 | $11,393 | Implemented |
NT0021 # 06 Y:2024 | 06 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $16,970 | $0 | Implemented |
MU0044 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $506 | $138 | Implemented |
MU0044 # 09 Y:2024 | 09 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $362 | $0 | Implemented |
MU0044 # 10 Y:2024 | 10 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,537 | $3,386 | Implemented |