IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1912 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,364 $30,555 Implemented
UK1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,487 $2,150 Implemented
UK1912 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,541 $0 Implemented
UK1912 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $86,767 $5,000 Implemented
UK1707 # 12 Y:2017 12 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,296 $2,550 Implemented
UK1707 # 11 Y:2017 11 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $34,216 $0 Implemented
UK1707 # 10 Y:2017 10 2017 OPTIMIZE PLANT POWER FACTOR $81,973 $62,685 Implemented
UK1707 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,235 $2,650 Implemented
UK1707 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99,925 $62,274 Implemented
UK1707 # 05 Y:2017 05 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $2,584 $6,427 Implemented
UK1707 # 04 Y:2017 04 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,886 $11,500 Implemented
UK1707 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,257 $900 Implemented
UK1707 # 01 Y:2017 01 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,711,450 $2,189,000 Implemented
UK1504 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,819 $0 Implemented
UK1504 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,473 $0 Implemented
UK1504 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $2,405 $810 Implemented
UK1504 # 07 Y:2015 07 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $6,448 $6,381 Implemented
UK1504 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,588 $1,750 Implemented
UK1504 # 03 Y:2015 03 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $453 $405 Implemented
UK1503 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $17,159 $9,380 Implemented
UK1503 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $556 $2,470 Implemented
UK1503 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,001 $5,000 Implemented
UK1503 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,831 $3,000 Implemented
UK1503 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $5,138 $3,760 Implemented
UK1503 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $945 $520 Implemented