Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
486
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0842 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,753 | $2,522 | Implemented |
UD0842 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $750 | $2,910 | Not Implemented |
UD0842 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,725 | $3,654 | Implemented |
UD0842 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,349 | $16,000 | Not Implemented |
UD0842 # 07 Y:2011 | 07 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $29,274 | $20,000 | Not Implemented |
UD0842 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $789 | $0 | Not Implemented |
UD0842 # 09 Y:2011 | 09 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,663 | $15,000 | Not Implemented |
UD0842 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,657 | $500 | Implemented |
UD0842 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $74,004 | $162,000 | Not Implemented |
UD0842 # 12 Y:2011 | 12 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $76,354 | $14,000 | Not Implemented |
UD0842 # 13 Y:2011 | 13 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,187 | $0 | Implemented |
UD0842 # 14 Y:2011 | 14 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $39,018 | $150,000 | Implemented |
UD0842 # 15 Y:2011 | 15 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $2,325 | $3,523 | Not Implemented |
UD0842 # 16 Y:2011 | 16 | 2011 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $9,925 | $10,558 | Not Implemented |
UD0816 # 01 Y:2010 | 01 | 2010 | OPTIMIZE PLANT POWER FACTOR | $2,978 | $0 | Not Implemented |
UD0816 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,468 | $0 | Implemented |
UD0816 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,881 | $0 | Implemented |
UD0816 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,929 | $0 | Implemented |
UD0816 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,108 | $0 | Implemented |
UD0816 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $22,144 | $0 | Implemented |
UD0816 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $346 | $0 | Not Implemented |
UD0816 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $6,179 | $0 | Not Implemented |
UD0816 # 09 Y:2010 | 09 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,412 | $0 | Implemented |
UD0816 # 10 Y:2010 | 10 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,601 | $0 | Not Implemented |
UD0816 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,426 | $0 | Implemented |