Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,856
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0454 # 04 Y:2003 | 04 | 2003 | INSTALL SET-BACK TIMERS | $4,115 | $400 | Implemented |
WI0454 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,128 | $1,980 | Implemented |
WI0454 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,192 | $1,600 | Implemented |
UD0683 # 01 Y:2003 | 01 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $30,335 | $50,000 | Not Implemented |
UD0683 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,720 | $11,700 | Implemented |
UD0683 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $2,600 | $4,625 | Not Implemented |
UD0683 # 04 Y:2003 | 04 | 2003 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,225 | $0 | Not Implemented |
UD0683 # 05 Y:2003 | 05 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $925 | $0 | Not Implemented |
UD0683 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $200 | $0 | Not Implemented |
MI0068 # 01 Y:2003 | 01 | 2003 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $2,625 | $80 | Not Implemented |
MI0068 # 02 Y:2003 | 02 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,426 | $285 | Not Implemented |
MI0068 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $131 | $155 | Not Implemented |
MI0068 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $291 | $29 | Implemented |
MI0068 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,099 | $169 | Not Implemented |
MA0540 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,726,195 | $11,884,320 | Not Implemented |
MA0540 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,349 | $28,595 | Not Implemented |
MA0540 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $32,261 | $17,920 | Not Implemented |
MA0540 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,447 | $7,000 | Not Implemented |
MA0540 # 05 Y:2003 | 05 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,042 | $6,200 | Not Implemented |
MA0540 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $295,995 | $436,450 | Not Implemented |
MA0540 # 07 Y:2003 | 07 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $5,220 | $650 | Not Implemented |
MA0540 # 08 Y:2003 | 08 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $3,581 | $5,497 | Not Implemented |
MA0540 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,968 | $15,662 | Implemented |
IA0329 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,170 | $533 | Implemented |
IA0329 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,024 | $250 | Implemented |