Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,786
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0267 # 02 Y:2003 | 02 | 2003 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,510 | $0 | Implemented |
SF0267 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,968 | $3,164 | Not Implemented |
SF0267 # 04 Y:2003 | 04 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,638 | $877 | Not Implemented |
SF0267 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,641 | $10,047 | Not Implemented |
SF0267 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $39,106 | $0 | Implemented |
SF0267 # 07 Y:2003 | 07 | 2003 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,821 | $3,895 | Implemented |
SF0267 # 08 Y:2003 | 08 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $51,465 | $60,181 | Not Implemented |
SF0267 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,206 | $3,741 | Implemented |
SF0267 # 10 Y:2003 | 10 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,536 | $38,576 | Not Implemented |
SF0267 # 11 Y:2003 | 11 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,587 | $34,108 | Not Implemented |
SF0267 # 12 Y:2003 | 12 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,463 | $14,493 | Implemented |
SF0267 # 13 Y:2003 | 13 | 2003 | INSTALL OCCUPANCY SENSORS | $934 | $4,585 | Not Implemented |
SF0267 # 14 Y:2003 | 14 | 2003 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $3,500 | $0 | Implemented |
SF0267 # 15 Y:2003 | 15 | 2003 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $15,500 | $9,900 | Implemented |
SF0267 # 16 Y:2003 | 16 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,500 | $18,000 | Implemented |
UM0242 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $9,740 | $6,270 | Not Implemented |
UM0242 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,195 | $1,000 | Not Implemented |
UM0242 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,670 | $300 | Not Implemented |
UM0242 # 04 Y:2003 | 04 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,040 | $1,100 | Not Implemented |
UM0242 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $4,180 | $645 | Not Implemented |
UM0242 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $2,170 | Not Implemented |
WI0451 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $21,502 | $30,000 | Not Implemented |
WI0451 # 02 Y:2003 | 02 | 2003 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $14,092 | $36,000 | Not Implemented |
WI0451 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,847 | $3,433 | Not Implemented |
WI0451 # 04 Y:2003 | 04 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,486 | $500 | Not Implemented |