Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,786
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0323 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,373 | $19,250 | Not Implemented |
SD0323 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,024 | $2,500 | Not Implemented |
SD0323 # 06 Y:2003 | 06 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,436 | $1,116 | Implemented |
SD0323 # 07 Y:2003 | 07 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,039 | $0 | Not Implemented |
SD0323 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,150 | $5,000 | Not Implemented |
SD0323 # 09 Y:2003 | 09 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $44,000 | $25,000 | Not Implemented |
UD0670 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,320 | $4,000 | Not Implemented |
UD0670 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,300 | $5,520 | Not Implemented |
UD0670 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,440 | $20,540 | Implemented |
UD0670 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,218 | $0 | Implemented |
UD0670 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,644 | $3,620 | Not Implemented |
UD0670 # 06 Y:2003 | 06 | 2003 | DISCONNECT BALLASTS | $1,597 | $144 | Implemented |
UD0670 # 07 Y:2003 | 07 | 2003 | DISCONNECT BALLASTS | $1,367 | $70 | Implemented |
UD0670 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,243 | $2,500 | Not Implemented |
UD0670 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $813 | $1,458 | Implemented |
UD0670 # 10 Y:2003 | 10 | 2003 | INSULATE BARE EQUIPMENT | $730 | $160 | Not Implemented |
AM0438 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $12,900 | $18,200 | Implemented |
AM0438 # 02 Y:2003 | 02 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,900 | $0 | Implemented |
AM0438 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,700 | $0 | Implemented |
AM0438 # 04 Y:2003 | 04 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $2,350 | $0 | Implemented |
AM0438 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $260 | $60 | Not Implemented |
AS0352 # 01 Y:2003 | 01 | 2003 | INSTALL SKYLIGHTS | $1,977 | $4,374 | Not Implemented |
AS0352 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $402 | $1,000 | Implemented |
AS0352 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,619 | $120 | Implemented |
AS0352 # 04 Y:2003 | 04 | 2003 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,075 | $700 | Not Implemented |