IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0784 # 13 Y:2008 13 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,512 $0 Not Implemented
UD0784 # 14 Y:2008 14 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,907 $0 Not Implemented
UD0784 # 15 Y:2008 15 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,701 $2,000 Not Implemented
UD0784 # 16 Y:2008 16 2008 UPGRADE CONTROLS ON COMPRESSORS $828 $0 Not Implemented
UD0784 # 17 Y:2008 17 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $1,000 Not Implemented
UD0756 # 01 Y:2007 01 2007 USE POWER DURING OFF-PEAK PERIODS $58,368 $0 Implemented
UD0756 # 02 Y:2007 02 2007 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $54,790 $0 Implemented
UD0756 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,822 $18,000 Implemented
UD0756 # 04 Y:2007 04 2007 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $42,997 $210,200 Not Implemented
UD0756 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,237 $86,570 Implemented
UD0756 # 06 Y:2007 06 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $30,653 $5,000 Implemented
UD0756 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,570 $0 Not Implemented
UD0756 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,516 $30,000 Not Implemented
UD0756 # 09 Y:2007 09 2007 INSULATE BARE EQUIPMENT $26,847 $15,750 Not Implemented
UD0756 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,180 $12,000 Implemented
UD0756 # 11 Y:2007 11 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $13,900 $15,000 Not Implemented
UD0756 # 12 Y:2007 12 2007 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,769 $0 Implemented
UD0756 # 13 Y:2007 13 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $4,680 Implemented
UD0756 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $150 Implemented
WV0319 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $7,154 $535 Implemented
WV0319 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,038 $1,300 Not Implemented
WV0319 # 03 Y:2005 03 2005 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,621 $4,400 Implemented
WV0319 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,456 $0 Implemented
WV0319 # 05 Y:2005 05 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,354 $1,476 Not Implemented
WV0319 # 06 Y:2005 06 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,156 $5,590 Not Implemented