IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

248

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0813 # 05 Y:2020 05 2020 PAY UTILITY BILLS ON TIME $1,735 $0 Implemented
AM0813 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,380 $13 Implemented
AM0813 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $6,880 Implemented
AM0813 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,260 $2,000 Implemented
AM0813 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $9,070 $14,280 Not Implemented
TR0027 # 01 Y:2020 01 2020 USE OPTIMUM THICKNESS INSULATION $5,150 $2,324 Implemented
TR0027 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $1,562 Implemented
TR0027 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,856 $4,480 Implemented
TR0027 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $44 $60 Implemented
AM0807 # 02 Y:2020 02 2020 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,390 $800 Not Implemented
AM0806 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $49,500 $85,000 Not Implemented
AM0806 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,025 $24,685 Not Implemented
AM0806 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,300 $10,600 Implemented
AM0806 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $5,470 $3,350 Implemented
AM0806 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $1,000 Not Implemented
AM0806 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,580 $2,250 Not Implemented
AM0806 # 07 Y:2020 07 2020 USE SYNTHETIC LUBRICANT $1,970 $300 Not Implemented
AM0806 # 08 Y:2020 08 2020 USE COMPRESSOR AIR FILTERS $1,040 $135 Implemented
AM0806 # 09 Y:2020 09 2020 PAY UTILITY BILLS ON TIME $484 $0 Implemented
AM0807 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,795 $2,700 Not Implemented
AM0807 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,243 $320 Not Implemented
AM0807 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $604 $1,239 Implemented
AM0807 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $16 Not Implemented
AM0807 # 07 Y:2020 07 2020 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,430 $4,570 Implemented
AM0807 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,462 $1,138 Implemented