IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0578 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $13,935 $4,000 Not Implemented
WV0578 # 03 Y:2019 03 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,677 $17,920 Not Implemented
WV0578 # 04 Y:2019 04 2019 USE EVAPORATION TO CONCENTRATE MATERIAL $6,422 $11,000 Not Implemented
WV0578 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,104 $3,500 Implemented
WV0578 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $5,469 $692 Implemented
WV0578 # 08 Y:2019 08 2019 MINIMIZE WATER USAGE $1,375 $700 Not Implemented
WV0578 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,217 $46 Implemented
WV0578 # 10 Y:2019 10 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $174 $221 Implemented
AM0780 # 01 Y:2019 01 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,900 $4,745 Not Implemented
AM0780 # 02 Y:2019 02 2019 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,220 $0 Implemented
AM0780 # 03 Y:2019 03 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,250 $3,080 Not Implemented
AM0780 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,050 $50 Not Implemented
AM0780 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $370 $600 Not Implemented
AM0780 # 06 Y:2019 06 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $80 $0 Not Implemented
LE0473 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $710 $25 Not Implemented
LE0473 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,965 $6,000 Not Implemented
LE0473 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $743 Not Implemented
LE0473 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $830 $2,550 Not Implemented
LE0473 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,413 $21,000 Not Implemented
LE0473 # 06 Y:2019 06 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $2,000 Not Implemented
UF0525 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,580 $31,585 Implemented
UF0525 # 02 Y:2019 02 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,500 $33,800 Not Implemented
UF0525 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,245 $18,331 Implemented
UF0525 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,084 $4,798 Implemented
UF0525 # 05 Y:2019 05 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,145 $3,960 Implemented