Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,797
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0012 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,638 | $9,825 | Implemented |
NL0012 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $920 | $980 | Not Implemented |
NL0012 # 06 Y:2017 | 06 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $582 | $2,100 | Not Implemented |
NL0012 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $163 | $157 | Implemented |
BS0103 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $181 | $74 | Not Implemented |
BS0103 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $172 | $60 | Not Implemented |
BS0103 # 03 Y:2017 | 03 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $4,908 | $2,820 | Not Implemented |
BS0103 # 04 Y:2017 | 04 | 2017 | MINIMIZE WATER USAGE | $1,019 | $585 | Not Implemented |
BS0103 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $133 | $78 | Not Implemented |
BS0103 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,369 | $1,489 | Not Implemented |
BS0103 # 07 Y:2017 | 07 | 2017 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $29,041 | $79,703 | Not Implemented |
BS0103 # 08 Y:2017 | 08 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $222,139 | $1,220,494 | Not Implemented |
BS0103 # 09 Y:2017 | 09 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,633 | $246 | Not Implemented |
BS0103 # 10 Y:2017 | 10 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,420 | $4,153 | Not Implemented |
UA0184 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,297 | $94,071 | Not Implemented |
UA0184 # 02 Y:2017 | 02 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $105,154 | $36,000 | Not Implemented |
UA0184 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,924 | $6,004 | Not Implemented |
UA0184 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,765 | $1,285 | Not Implemented |
UA0184 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,492 | $250 | Not Implemented |
UA0184 # 06 Y:2017 | 06 | 2017 | OPTIMIZE PLANT POWER FACTOR | $12,098 | $21,400 | Not Implemented |
UA0184 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $1,155 | $2,485 | Not Implemented |
AM0736 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,040 | $14,990 | Implemented |
AM0736 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,030 | $9,000 | Not Implemented |
AM0736 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,590 | $6,390 | Implemented |
AM0736 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,710 | $400 | Implemented |