IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0925 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $229 Not Implemented
OK0925 # 06 Y:2015 06 2015 USE COMPRESSOR AIR FILTERS $757 $362 Implemented
OK0925 # 07 Y:2015 07 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $6,933 $5,596 Implemented
OK0925 # 08 Y:2015 08 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,748 $9,360 Not Implemented
OK0925 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,024 $10,944 Not Implemented
OK0925 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,128 $65,326 Not Implemented
OK0925 # 11 Y:2015 11 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,100 $9,690 Not Implemented
SD0521 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,923 $80,120 Not Implemented
SD0521 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,324 $35,903 Not Implemented
SD0521 # 03 Y:2016 03 2016 RECOVER AND REUSE WASTE MATERIAL $11,486 $5,500 Not Implemented
SD0521 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $8,590 $4,950 Not Implemented
SD0521 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,749 $1,000 Not Implemented
SD0521 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,938 $800 Not Implemented
SD0521 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,421 $3,450 Not Implemented
SD0521 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,279 $1,300 Not Implemented
SD0521 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $1,418 $3,648 Not Implemented
SD0521 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $566 $203 Not Implemented
OK0930 # 01 Y:2015 01 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137,102 $90,000 Not Implemented
OK0930 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,351 $10,800 Not Implemented
OK0930 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,131 $0 Implemented
SU0401 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $2,820 $0 Implemented
SU0401 # 02 Y:2015 02 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,274 $1,580 Implemented
SU0401 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $964 $469 Not Implemented
SU0401 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $383 $240 Implemented
SU0401 # 05 Y:2015 05 2015 REPLACE BOILER $11,805 $10,686 Implemented