IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0378 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,743 $5,800 Implemented
LE0378 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,860 $36,800 Implemented
IP0025 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,805 $0 Not Implemented
IP0025 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,161 $0 Not Implemented
IP0025 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Not Implemented
IP0025 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,545 $0 Not Implemented
IP0025 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $60 Not Implemented
IP0025 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $0 Not Implemented
IP0025 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,123 $1,770 Not Implemented
IP0025 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,944 $3,961 Not Implemented
WM0046 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $132 Implemented
WM0046 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $394 $320 Implemented
WM0046 # 03 Y:2014 03 2014 IMPROVE SPACE COMFORT CONDITIONING $5,525 $595 Implemented
WM0046 # 04 Y:2014 04 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,846 $75,000 Not Implemented
BD0444 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $56,158 $204,710 Not Implemented
BD0444 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $54,135 $150,000 Not Implemented
BD0444 # 03 Y:2014 03 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,140 $18,000 Not Implemented
BD0444 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,722 $300 Implemented
BD0444 # 05 Y:2014 05 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,193 $37 Not Implemented
BD0444 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $552 $2,700 Not Implemented
BD0444 # 07 Y:2014 07 2014 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $465,422 $19,400 Not Implemented
BD0443 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $119,363 $2,000 Not Implemented
BD0443 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,592 $225 Implemented
BD0443 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,323 $11,250 Implemented
BD0443 # 04 Y:2014 04 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,701 $15,300 Not Implemented