Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
182
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0253 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $43,447 | $8,510 | Not Implemented |
IC0253 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $50 | $0 | Not Implemented |
IC0253 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $39,245 | $13,624 | Not Implemented |
IC0253 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,199 | $9,023 | Not Implemented |
IC0253 # 05 Y:2022 | 05 | 2022 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $21,572 | $7,624 | Not Implemented |
IP0106 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,159 | $21,897 | Implemented |
IP0106 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,543 | $9,687 | Not Implemented |
IP0106 # 01 Y:2018 | 01 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,724 | $0 | Not Implemented |
IP0106 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $548 | $1,325 | Implemented |
BD0490 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,902 | $3,069 | Implemented |
BD0490 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $630 | $800 | Implemented |
BD0490 # 09 Y:2016 | 09 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $478 | $20 | Not Implemented |
BD0490 # 06 Y:2016 | 06 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $1,813 | $1,100 | Not Implemented |
BD0490 # 10 Y:2016 | 10 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $394 | $400 | Not Implemented |
BD0490 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $14,526 | $1,150 | Not Implemented |
BD0490 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,072 | $1,500 | Not Implemented |
BD0490 # 02 Y:2016 | 02 | 2016 | USE PHOTOCELL CONTROLS | $7,997 | $2,000 | Not Implemented |
BD0490 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,025 | $2,501 | Not Implemented |
BD0490 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $300 | Not Implemented |
BD0466 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $777 | $1,000 | Not Implemented |
BD0466 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,362 | $20 | Not Implemented |
BD0466 # 11 Y:2015 | 11 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $25 | Implemented |
BD0466 # 06 Y:2015 | 06 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $2,803 | $2,200 | Not Implemented |
BD0466 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $899 | $1,275 | Implemented |
BD0466 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,559 | $8,515 | Implemented |