IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

567

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0859 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $1,000 Implemented
UD0859 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $20,256 $6,033 Implemented
UD0859 # 07 Y:2012 07 2012 REDUCE EXCESS STEAM BLEEDING $20,148 $0 Implemented
UD0859 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,768 $2,000 Implemented
MZ0084 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,602 $15,200 Implemented
MZ0084 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $3,500 Implemented
MZ0084 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,736 $11,730 Implemented
MZ0084 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $6,939 $0 Implemented
MZ0084 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $1,483 $2,500 Implemented
MZ0084 # 10 Y:2012 10 2012 OPERATE BOILERS ON HIGH FIRE SETTING $10,918 $1,770 Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
SU0318 # 02 Y:2012 02 2012 USE SYNTHETIC LUBRICANT $7,917 $0 Implemented
SU0318 # 03 Y:2012 03 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $72 $0 Implemented
SU0318 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $106,547 $32,436 Implemented
SU0318 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $162,692 $408,153 Implemented
SU0318 # 09 Y:2012 09 2012 UPGRADE OBSOLETE EQUIPMENT $211 $795 Implemented
OK0825 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,541 $68,775 Implemented
OK0825 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,478 $1,500 Implemented
OK0825 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $538 Implemented
TT0086 # 01 Y:2012 01 2012 USE OPTIMUM THICKNESS INSULATION $920 $950 Implemented
TT0086 # 02 Y:2012 02 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,061 $0 Implemented