Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0597 # 09 Y:2023 | 09 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $35,500 | $4,261 | Implemented |
UF0597 # 08 Y:2023 | 08 | 2023 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $51,744 | $18,218 | Implemented |
UF0597 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $1,699 | $4,994 | Implemented |
UF0597 # 05 Y:2023 | 05 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,959 | $11,134 | Implemented |
UF0597 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,142 | $22,000 | Implemented |
UF0597 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,736 | $15,722 | Implemented |
UF0597 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,876 | $14,705 | Implemented |
UF0597 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,382 | $13,706 | Implemented |
UU0219 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,112 | $13,345 | Implemented |
NL0078 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,358 | $17,280 | Implemented |
NL0078 # 01 Y:2023 | 01 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $31,345 | $100,000 | Implemented |
NL0078 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,587 | $2,300 | Implemented |
NL0078 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $812 | $2,080 | Implemented |
NL0078 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $658 | $80 | Implemented |
NL0078 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $415 | Implemented |
NL0078 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $128 | $250 | Implemented |
MA0853 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,336 | $24,300 | Implemented |
MA0853 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,613 | $59,377 | Implemented |
MA0853 # 03 Y:2023 | 03 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,672 | $30,500 | Implemented |
MA0853 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,202 | $18,988 | Implemented |
AM0862 # 06 Y:2023 | 06 | 2023 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,203 | $4,750 | Implemented |
AM0862 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,080 | $16,563 | Implemented |
AM0862 # 03 Y:2023 | 03 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $18,325 | $6,300 | Implemented |
AM0862 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $27,516 | $41,926 | Implemented |
AM0862 # 01 Y:2023 | 01 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $80,175 | $8,170 | Implemented |